Wednesday, 7 May 2014

New benchmark for office space, Pusat Bandar Damansara at RM1,200 range

The nine office blocks in Pusat Bandar Damansara have been scheduled to be demolished in the third quarter of 2014. Lim owns two pieces of land there.
PETALING JAYA: Datuk Desmond Lim Siew Choon, who is planning to demolish and rebuild a mixed integrated development in Pusat Bandar Damansara (PBD), seems to have set a benchmark for office space in that area at between RM1,000 and RM1,200 per sq ft, sources said. The first phase of the office block is expected to be completed in three to four years.

The 9.58-acre parcel, one of several in that area, is the current site of nine office blocks of six and seven storeys high.

A source said the price range seemed “reasonable” in spite of the oversupply of office space.

Another consultant Siders Sittampalam, managing director of PPC International Sdn Bhd, said a more reasonable range would be RM1,000-RM1,100 per sq ft.

The scenario of Lim setting a benchmark for PBD office space has come about as a result of Impian Ekspresi Sdn Bhd offering to buy out owners of 25 parcels of properties there. Impian Ekspresi, a vehicle

Lim indirectly controls, is the owner and developer of PBD.
Lim, best known for shopping mall Pavilion Kuala Lumpur, is also the executive chairman of Malton Bhd and chairman of Pavilion Reit.

It is believed that a few of the owners are resisting the move while the majority are agreeable, sources said.

Lim has fought a long legal battle with Johor Corp (JCorp) over the prized PBD development.

When it was finally resolved in September 2013, tenants in PBD were given monthly tenancy contracts. The buying-out of the 20 odd owners is seen as the last hurdle to empty the area for demolition works to begin in the third quarter of this year.

The nine blocks will be reduced to rubble on a staggered basis over a period of about one year. Most of the tenants have terminated their contracts. “Tenants have ‘terminated’ the contracts themselves and some of the owners have been paid,” a source said.

Sources said the owners have been offered “less than RM1,000 per sq ft” for their properties.

“They will be able to buy the new units at about the same price they sold their existing parcels as a sort of concession. Any additional space will be sold at between RM1,000 and RM1,200 per sq ft, or the prevalent market rate,” a source said.

Siders said a reasonable rate would be between RM650 and RM700 per sq ft as the buildings are old. It is uncertain if the owners, about 20 of them, were offered the same price for their parcels.

The new mixed integrated development, comprising serviced apartments, offices and a hotel, is expected to be built over a period of five to six years. There is a likelihood some of the offices may be completed earlier, sources said.

Lim paid cash RM500mil and conducted an asset exchange for this 9.58-acre site.

The asset exchange comprised some office space to be built in the new redeveloped PBD and an existing 20-storey commercial office building at V Square@PJ City Centre in Petaling Jaya.

There have been comments by certain parties that Lim got the 9.58 acres at a good price as he did not have to fork out much cash because of the asset exchange whereas he paid a premium for an adjacent parcel of 6.34 acres in the same area last March.

This second parcel is closer to the Bangsar-Jalan Damansara intersection.

Lim bought it via Jendela Mayang Sdn Bhd, a company linked to him. He paid RM450mil for that parcel, or RM1,628 per sq ft. Selangor Properties Bhd (SelProp) was the vendor.

Sources said it was not possible to compare the prices paid for the two pieces of land although they are located in the same area and adjacent to each other because Lim would have to pick up the tab for demolishing the nine structures. The second piece is currently used as a public car park.

Lim is expected to build shopping mall Pavilion 2 on the former car park land and connect it to the Pusat Bandar Damansara MRT station which is currently being built over the Bangsar-Jalan Damansara intersection.

C H Williams, Talhar & Wong managing director Foo Gee Jen said Lim’s interest in PBD was not just about land, although that was an important factor.

“It is about refurbishment, increasing plot ratio and the MRT right at your door step.

“That is what (Desmond) Lim is paying for when he paid a premium for the second piece of land.

“It is about connecting Pavilion KL to Pavilion 2 via 10 minutes by rail and in time to come, his third mall in Bukit Jalil, which will also be connected by rail,” said Foo. “The MRT is the premium which cannot be translated into a per sq ft basis,” Foo said.

He said the beauty of that 9.58 acres is that it is S-shaped. He can demolish all or part of it and do a hybrid but he will have to improve the basement parking, according to Foo.

SelProp built PBD in the 1980s with a plot ratio of four. Lim is expected to increase that to 7.5 or 8.


For more information on Building and Construction event, please visit www.asiapacificevents.com


 

Tuesday, 6 May 2014

Talam to get new shareholders


PETALING JAYA: Property developer Talam Transform Bhd is working on a restructuring exercise that will see the emergence of new investors and the exit of its existing largest shareholder – Kumpulan Europlus Bhd (KEuro).

Among the new investors are existing shareholders of Multi Purpose Holdings Bhd (MPHB), which is controlled by Datuk Surin Upatkoon. Surin is already an indirect shareholder of Talam, which was founded by Tan Sri Chan Ah Chye (pic inset) , through MWE Bhd.


 “Some new money will come from the investors as the company undertakes a corporate exercise to beef up its balance sheet. They are investing money because they believe the stock has long-term potential.

 “But the new investors will remain as passive shareholders and will not drive operations,” said a source.

Chan is likely to stay on at Talam but his role may be reduced.

Analysts were not too concerned about shareholders of MPHB taking up an interest in Talam. They were more interested in the potential dividend pay-out by MPHB’s listed-subsidiary, MPHB Capital Bhd.

“MPHB Capital recently sold some land, which gave rise to talks of it paying out a special dividend. That is where the attention is now,” said an analyst.

After three consecutive years of making losses, Talam returned to the black in its recent financial year ended Jan 31, 2014.

It posted a full-year net profit of RM9.58mil on revenue of RM171.7mil, mainly due to a RM100.67mil disposal gain of investment properties.

In its filing with Bursa Malaysia, the group said it had completed all unfinished houses and will continue to team up with “reputable corporations” to develop its land bank.

However, it foresees a difficult year ahead due to tougher lending guidelines by Bank Negara as well as increasing construction costs.

KEuro’s impending exit from Talam is not surprising as the company that is managed by its largest shareholder, IJM Corp Bhd, is focussed on implementing the West Coast Expressway.

KEuro needed strong shareholders to undertake the RM6bil 233km highway project, which resulted in the exit of Chan.

In October last year, Chan, together with his wife Puan Sri Thong Nyok Choo, sold a 22.15% stake in KEuro to MWE Holdings Bhd for RM155.8mil.

This transaction paved the way for MWE to becoming the second largest shareholder in KEuro after IJM’s 25.1%.
MWE is another listed company that is controlled by Surin.

Chan’s direct stake in Talam stands at 1.09%, while his indirect stake is through his remaining holdings in KEuro.

Surin’s emergence in Talam in October sent the share price to a 19-month high of 7.5 sen on Oct 16. It then settled at the between 6.5 sen and eight sen range.

A subsidiary of MWE, Pijaya Sdn Bhd, has been nibbling shares of Talam.
On April 14, its shares spiked to a high of 11 sen. Last Friday, it closed at 9.5 sen, 0.5 sen lower than the previous day with 89.26 million shares done.

In the 1990s, Talam was the dominant property developer in Selangor as the company bagged several privatisation projects from the state.

Some attributed this to Chan’s close links with the state government at that time.

However, like most other developers, Talam’s debts piled up and eventually was caught flat-footed during the Asian financial crisis in 1998.

Over-geared and unable to service its loan, Talam was forced to halt some of its half-completed projects.
Although it restructured its debts, Talam could not recover from the crisis.
When it was saddled with thousands of uncompleted houses, IJM Corp stepped in by taking up a stake in KEuro in 2005.

Since then, IJM has been driving KEuro, leaving the running of Talam to Chan and existing management.

Talam has a landbank of some 2,000 acres situated mainly in Cyberjaya, Selayang, Ulu Klang and Bukit Beruntung.

At its AGM in July 2013, Talam said that it was embarking on build-then-sell projects on a smaller scale, to prove that it is able to deliver.

It is calling tenders for its build-then-sell affordable housing project in Puchong, which is expected to commence in the second half of 2014. 


For more information on Building and Construction event, please visit www.asiapacificevents.com

Monday, 5 May 2014

Measures to boost Singapore's construction sector productivityEmail Print Text Resize+-reset

SINGAPORE: From the second half of this year, the government will make productive technologies like the Prefabricated, Pre-finished Volumetric Construction and Cross Laminated Timber part of tender conditions for certain government land sales sites.
It will also be further raising the minimum buildable design and constructability scores in September this year and then again in September 2015.
These measures to boost construction sector productivity were announced in Parliament on Monday.
Nanyang Technological University (NTU) is building Singapore's first multi-storey development using Prefabricated, Pre-finished Volumetric Construction or PPVC.
Successfully used in the US, UK and Australia, PPVC allows whole apartment-sized units, complete with internal fixtures, to be installed on-site.
The new hostel North Hill, which can house 1,800 students, is expected to be completed in end-2015.
Mr Paul Chain, Chief Executive Officer, NTU Development & Facilities Management, said: "We are expecting 40% of labour savings. We are using a bit more materials, so material cost will be higher, but I think if we control properly, the increase in cost ought to be marginal, should not be more than 5%-10%."
NTU is also adopting another new technology - Cross Laminated Timber - in the construction of its new sports hall.
The engineered timber can be used as structural and non-structural components in a building project.

Responding to Channel NewsAsia's query, the Singapore Civil Defence Force (SCDF) said it supports initiatives aimed at raising construction productivity by leveraging new technologies, such as Cross Laminated Timber (CLT).
The SCDF added that a comprehensive list of fire safety requirements was sent out to the building industry on 6 March to support the request for CLT use in building construction.
It was also announced in Parliament on Monday that developers will be required to use Prefabricated Bathroom Units (PBUs) for all residential government land sales (GLS) sites from the second half of this year.
According to the Building and Construction Authority (BCA), more than 14,000 PBUs have been fully fitted out in factories and assembled on-site and they have been used in over 20 private residential projects since 2005.
The government will also set a minimum percentage of prefab level for industrial GLS sites.
Some concerns among developers in using more prefab components include the transportation of large prefab units to the worksite as well as precast supply.
To address this, BCA will roll out more land tenders to have about 10 integrated construction and precast hubs by 2020.
Together with the firms' precast yards in Malaysia, these are sufficient to meet the rising demand of precast components of the industry in the years ahead, says the government.
BCA's CEO, John Keung, said: "You can do precast manufacturing, you can do a lot of prefabrication work, like building the prefab bathroom, you can use it for storage. It is a very intensive use of land. These are enclosed production space, so you can do two shifts if you want to and that will increase the capacity of production."
BCA will also be gradually raising the minimum buildable design and constructability scores to promote easier-to-build building designs and labour-efficient construction methods.
The tightening of the buildable design score by September 2015 could help to achieve manpower savings of 16% to 22%.
BCA says appropriate enforcement action may be taken against developers whose projects deviate from the approved plan. The authority can issue stop work order for non-compliance.
This is in addition to existing penalties including withholding the temporary occupation permit and a fine of up to S$10,000.
BCA says it will also mandate standard components like various floor heights and doors as well as productive technologies such as dry walls for residential projects in September 2014.
Developers will be required to use drywalls for all internal partition wall except wet areas for residential non-landed projects.
To help companies, the government set up a S$250m Construction Productivity and Capability Fund in 2010.
To date, over S$160m has been committed and the scheme has benefited over 4,000 firms, of which 80% are smaller firms.
Mr Lee Yi Shyan, Senior Minister of State for National Development, said: "We will top up the 5-year Fund with another S$30 million to benefit more companies before it ends in 2015. We will explore a second 5-year tranche of funding later when the first one expires."
Mr Lee said the public sector - which is expected to account for about half of the total projected construction demand in the coming years - can take the lead in adopting productive technologies.
For a start, the Ministry of Health will pilot the PPVC system in a nursing home project.
The government will also review its tender evaluation framework for public sector projects to recognise more productive methods of construction.
Mr Lee said: "We will progressively increase the weightage for the productivity component in the Price-Quality Method (PQM) to favour productive construction designs and methods.
"For the Quality Fee Method (QFM), consultants who adopt more buildable design will similarly be recognised with higher productivity score."


For more information on Building and Construction seminars, please visit www.asiapacificevents.com

Sunday, 4 May 2014

Avani resort set to change Selangor coastal town into a tourist destination


Avani sets to change the perception of Sepang, turning it into a tourist destination in Selangor

AVANI Sepang Gold Coast Resort is the first of the Minor International Pcl (Mint) venture in Malaysia but the property will not be the last of their investments in this country.
Its owner American-born billionaire William Ellwood Heinecke, who arrived here in his private jet, said he has set his eyes on Malaysia.
“Sepang is a wonderful opportunity and a perfect getaway as a luxury hotel in this region. I believe the resort will attract many tourists,” he said.
He said the hotel’s beautiful architecture reminded him of the Anantara Dubai The Palm Resort and Spa.
“This venture marks an important milestone for the chain in this country,” he added.
The resort, formerly operated as Golden Palm Tree Iconic Resort and Spa, went through a RM15mil refurbishment.
It has 392 contemporary Polynesian-inspired rooms with sea view frontage, five restaurants, a spa, butler service, private buggy and an 840sq metre ballroom, the third largest in Malaysia.
Heinecke, a Thai citizen, who is also Mint chairman and chief executive officer, said the re-branding officially marked the hotel as one of the five hotels managed by Minor Hotel Group’s (MHG).
A signing ceremony, officially appointing MHG to manage the property was witnessed by Tengku Sulaiman Shah, Sepang Goldcoast Group executive president MC Wong, Sepang Goldcoast chairman Yanki Regan, Minor Hotel Group CEO Dhilip Rajakarier and Avani Sepang Goldcoast Resort general manager Thomas Fehlbier.
MHG is a hotel owner, operator and investor. It has over 100 hotels, resorts and serviced suites in operation under Anantara, Avani, Per Aquum, Oaks, Elewana, Marriott, Four Seasons, St Regis and Minor International brands in 14 countries across Asia Pacific, the Middle East, Africa and the Indian Ocean.
Mint focuses on three primary businesses — restaurants, hotels and lifestyle brands distribution. It is one of Asia’s largest restaurant companies with over 1,500 outlets operating in 19 countries under The Pizza Company, Swensen’s, Sizzler, Dairy Queen, Burger King, Thai Express, The Coffee Club, Ribs and Rumps and Riverside brands.

Avani has 392 contemporary Polynesian-inspired rooms with sea view frontage.Avani Sepang Goldcoast Resort general manager Thomas Fehlbier (left) and Heinecke outside their new property in Sepang. 

The tycoon, who has more than 45,000 staff under him, credits his success to his great team.
“This success is not mine alone. It’s a great pleasure to work with an excellent team. All my staff is like my children. I make a point to hire executives who are smarter than me and remove mediocre staff. Only then you can see your company grow. Otherwise, the company will shrink,” said this 65-year-old businessman, who is worth US$1bil as of July 2013, according to Forbes’ rich list.
Heinecke founded the Minor Group in l967 and after three decades, it expanded to 30 companies. He has been Mint chairman since 1979.
Since acquiring his first hotel, the Royal Garden Resort in Pattaya in 1978, Mint has grown into one of the largest hospitality and leisure companies in the Asia-Pacific region.
“Running a hotel and a restaurant has similar rewards. It goes back to customers’ satisfaction. I always feel the most rewarding part in this business is staff development. I enjoy seeing how my staff rise from the ranks and become senior executives. It is also exciting to see how I’ve touched so many lives in all my 35 years,” said the bearded Heinecke, who has acquired more than 100 hotels and resorts, 1,300 restaurants and 200 retail-trading outlets.
The pragmatic wealthy man is a firm believer of “it is the people who made the company and not the other way round. I employ people with entrepreneurial skills.”
Despite the success, MINT still tries to meet the growing needs of consumers in Thailand and in 22 markets from Africa to Australia.
Heinecke’s success story began at 18 after he got married to the “right woman”, Kathy Heinecke.
“I made my first million after I got married. I was never the brightest student and I am self-taught. It’s all hard work.
“Everyone is created the same way, it is how we spend our hours that makes us different,” said Heinecke who was born in Virginia and grew up in Hong Kong, Japan and Thailand.
His father, Roy, was a United States diplomat in Asia while his mother, Constance, worked as an Asia correspondent for Time magazine. The family moved to Bangkok 50 years ago.
Like other teenage boys, he loved go-carts, motorbikes and cars but he did not go to college. His break came after he sold newspaper ads and formed his own advertising agency from the living room of his parents’ house.


Avani Sepang has an enchanting view to charm visitors to the resort.  

When go-cart racing became popular in Thailand, he convinced the Bangkok World editor to give him a weekly go-cart column.
His pay cheque was half of the ads he could sell and after a few months, he was drawing more than most reporters.
To double his income, he began cleaning offices at night, started a professional janitorial service, hired a couple of workers, printed a few dozen cards and eventually set up his first cleaning company, Inter Asian Entrepreneurs.
“I sold ads and worked at my advertising company after I got home. In the evening, I would go around and help my workers cleaned offices,” said Heinecke who has two sons.
With no college background and a very lean financial resources, young Heinecke marched into a lawyer’s office in Bangkok and gave US$1,000 to register two companies, Inter-Asian Enterprise and Inter-Asian Publicity.
The registration fee alone took most of the US$1,200, which he borrowed from a moneylender. He spent the leftover on mops and buckets and a few minutes of airtime on a local radio station.
He sold off Inter-Asian Publicity later to Ogilvy & Mather and founded his first company Minor Holdings at 17.
It is called Minor because he was a teenager when he founded it. By 21, while all his friends graduated from college, he was already a millionaire, a boss to 400 staff and grossed more than US$2.5mil a year which made headlines.

Following the rebranding exercise, the property by the sea is known as Avani Sepang Goldcoast Resort.

Minor Holdings became The Minor Group over the next four decades, spanning more than 30 companies. In 1991, he gave up his US citizenship for Thai, a decision he never regretted.
At 50, Heinecke was the owner of an extensive business empire and became the most successful foreign businessman in Thailand and one of the most-talked about expatriate entrepreneurs in South-East Asia.
Heineicke, a well-respected figure in the business community in Thailand, was recently honoured with the Asia’s Leading Travel Personality award, for the driving force behind the leading global brands under the Minor Group umbrella.
However, he said he never allowed the millions he has to get to his head.
“I have to thank my strong-willed wife, Kathy who keeps me grounded. She has no qualms telling me to put the garbage out or put the toothpaste cap on.
“So, the 100 hotels don’t get to my head. I have my feet firmly to the ground, in that sense,” said Heinecke whose hobbies include scuba diving, collecting vintage cars, including a 1963 US$3mil Shelby Cobra and a Ferrari, once belonged to Clint Eastwood, luxury motor yachts and private jets like Cessna Citation X.
Heinecke, author of The Entrepreneur: 25 Golden Rules for the Global Business Manager, a best seller that had been translated into a several languages, believes that in a crisis it is better to control the expenses than to slash costs across the board.
“You can make a lot of mistakes and still recover if you run an efficient operation. The entrepreneur who controls his expenses better than his rivals will achieve a competitive advantage, especially when he or she demands the highest standards of quality and service at the same time,” he said.

Thursday, 1 May 2014

Project 3B on Pulau Indah land?

KUALA LUMPUR: 1Malaysia Development Bhd (1MDB), which last week won the coveted 2,000mw coal-fired power plant known as Project 3B, may move the proposed project site to Pulau Indah, Selangor, from its original location in Jimah, Negeri Sembilan.

There has been rampant market speculation, with confirmation from several industry sources, that the state-owned investment company is in discussion with the Energy Commission (EC) to explore the relocation of the RM11 billion project to the 310-acre (125.45ha) piece of land in Pulau Indah which 1MDB recently purchased from Tadmax Resources Bhd for RM317.3 million.

The Pulau Indah land was acquired barely a week before Project 3B was awarded. 1MDB originally proposed to undertake Project 3B at the recently acquired 1,400mw Jimah Power Station.

It is understood, however, that a change of location would directly contravene the tender rules. The EC is under pressure to explain why it awarded Project 3B to 1MDB when YTL Power International Bhd had put in the lowest bid.

Both 1MDB and the EC could not be reached for comment.

Given that 1MDB now won the project, the change of location to Pulau Indah stands to benefit all the stakeholders — 1MDB, Tenaga Nasional Bhd as the sole off-taker, and the public as end-users, according to industry players. They believe Pulau Indah would be a better site for the power plant due to the size and location of the land.

Tadmax, one of the seven original contenders for Project 3B, had proposed the Pulau Indah site in its bid but the company did not make it to the next round after failing to meet the technical and financial requirements.

“Building two 1,000mw blocks on the Jimah site would be no mean feat. There simply isn’t enough room. Just use Google maps and see how much space the 1,400mw Jimah plant currently occupies. Then compare this with the vacant land [next to the existing Jimah plant] and imagine building a new 2,000mw plant there,” an industry player told The Edge Financial Daily.

Therefore, 1MDB is expected to undertake land reclamation if the Jimah site is to accommodate the huge 2,000mw plant. But land reclamation is not only expensive, it is also time-consuming. The scale of the earthworks would also make it challenging to meet the October 2018 deadline to hand over the first phase of Project 3B.

Also, the bigger site at Pulau Indah means that there would be room for future expansion, a bonus for 1MDB. When the tender for Project 3B was originally opened it was supposed to be a greenfield project.

Most of the existing brownfield coal-fired plants are already heavily planted up and lack room for expansion, said another industry player, adding that a new greenfield site would broaden the coal-fired planting-up options for the EC in the future.

Industry players also noted that it would be easier for 1MDB to build the transmission line from Pulau Indah to the Olak Lempit injection node than to build the line from Jimah to Olak Lempit. Both transmission lines would be about 30km long.

“The northern alignment [Pulau Indah to Olak Lempit] for the transmission lines would mainly run through plantation land, which is easy to acquire. In comparison, the southern alignment from Jimah runs through some land that might be difficult to acquire,” said an industry player.

However, the northern alignment would require the cooperation of the Selangor government.

It remains to be seen if 1MDB and the EC will be able to relocate Project 3B. On the one hand it would reflect poorly on the tender process if bidders were allowed to make material changes to their proposals even after the tender was awarded. If the EC allows the project to be relocated, it is likely the other bidders will call for a re-tender.

However, the relocation could be justified if 1MDB can offer lower tariffs to Tenaga.


This article first appeared in The Edge Financial Daily, on March 05, 2014.


For more information on Building and Construction seminars, please visit www.asiapacificevents.com

Tuesday, 29 April 2014

Suntrack to launch Cyberjaya SoHos by end May

CYBERJAYA: Suntrack Development Sdn Bhd and Prima Avenue Property Sdn Bhd plan to launch their new Kanvas SoHo joint venture in Cyberjaya by end-May, said Suntrack project director James Tan.

The SoHos, which are now open for registration and said to be “quite affordable”, are targeted at first-time property buyers, entrepreneurs, singles and couples working in Cyberjaya, he told reporters at a project briefing recently.

“There is potential for yields of up to 6% based on our surveys of comparable properties in the area,” said Tan.

He said the population of Cyberjaya, who are employees of companies primarily in the IT and service industries, is currently 52,000, but it is set to double by 2020.

He added the project has attracted much interest from the public.

The freehold Kanvas SoHo has a gross development value of RM201 million and comprises 646 SoHos housed in two 30-storey towers and 16 retail lots on a 3.4-acre site (1.37ha) on Jalan Teknokrat 6.

Priced from RM260,000 to RM322,000, the SoHos offer built-ups of 484 sq ft and 485 sq ft and come partly furnished with built-in kitchen cabinets, branded hoods and hobs, two air conditioners, a water heater tank, fridge and parking bay.

Maintenance fees are RM180 per month.

Other facilities include a 25m infinity pool, dipping pool with jacuzzi and gymnasium, as well as meeting rooms, storage cubicles for rent and two sky lounges atop the SoHo towers.

Access to the SoHos will be controlled by security cards that limit residents’ access to only common areas, including the sky lounges, and their own floors.

About 150 parking spaces will be allocated to the shops.

“Ideally, we’re looking at four restaurants, a supermarket and launderette,” he said of the potential retail tenant mix.

The project is aiming for green certification from the Real Estate and Housing Developer’s Association.

Some of its green features include cross ventilation, a predominantly north-south orientation and rainwater harvesting for use in common areas.

Kanvas SoHo is due to be completed by June 2017.



For more information on Building and Construction seminars, please visit www.asiapacificevents.com

Monday, 28 April 2014

Construction begins on Freeport A’Famosa Outlet Village

MELAKA: The Freeport A’Famosa Outlet Village in Alor Gajah has commenced construction after Tun Mohd Khalil Yaakob, the Yang di-Pertua Negeri of Melaka, broke ground in a ceremony last month.

The development, a partnership between A’Famosa Group’s wholly-owned subsidiary Langkah Realiti Sdn Bhd and Freeport Retail, a European developer, will have an estimated gross development value of RM190 million and a gross land area (GLA) of 310,000 sq ft (28,800  sq m).

Chris Milliken, the commercial director of Freeport Retail, said he is looking forward to bringing the Freeport outlet shopping experience to central Malaysia.

“We will offer premier designer fashion brands, casual wear, accessories and sports brands at low prices ... [with the development having] the added footfall benefit and synergy of two popular leisure and tourist destinations on its doorstep,” he said.

The Freeport A’Famosa Outlet Village will be next to A’Famosa Resort, a 520ha golf and leisure resort. Phase 1 will cover a GLA of 175,000 sq ft and feature more than 80 retail units, 1,200 parking bays as well as an exhibition and event hall. It is slated to open in April, 2015.

Julian Lau, director of Langkah Realiti, said that the joint venture with Freeport Retail is a major step forward for the retail industry in the region with long-term positive contributions to the state and local economy.

The project, which is expected to generate jobs for over 600 people, will be developed over three phases with Phase 2 spanning 62,000 sq ft of GLA and Phase 3, 73,000 sq ft. Freeport A’Famosa Outlet Village, with its strategic location and merchandise from international brands with savings of between 30% and 70%, is expected to be a major shopping destination.

The outlet will be designed as a single-level, village-style development with a Dutch colonial theme to reflect Melaka’s image as a historical town. The project will emphasise customer care with a VIP lounge, valet parking, gift wrapping and other personal shopping services.

The development will have a spillover from A’Famosa Resort’s two million visitors annually, a catchment of 9.3 million people from the Klang Valley, Negeri Sembilan and Melaka, as well as from the 14 million visitors who visit Melaka annually.

The site is accessible via the North-South Expressway and the Alor Gajah-Simpang Ampat interchange and is a 55 minute-drive from Kuala Lumpur.

A’Famosa Resort is a one-stop centre for business and pleasure. It offers an international championship golf course, a water theme park, animal safari, cowboy town, and hotels and villas.


This article first appeared in The Edge Financial Daily, on March 07, 2014.

For more information on Building and Construction seminars, please visit www.asiapacificevents.com