KUALA LUMPUR: Malaysia’s Mass Rapid Transit (MRT) project looks to generate a
gross national income (GNI) of between RM3 billion and RM4 billion per year,
said Datuk Sri Sufri Mohd Zin in his speech at the 41st Master Builders
Association Malaysia (MBAM) and International Federation of Asian & Western
Pacific Contractors’ Association (IFAWPCA) convention from March 2 to 5 in
Jakarta, Indonesia.
“The new MRT line is expected to raise property
values by an estimated RM300 million in gross development value, broaden house
buyers’ choices, expand developers’ projects to new areas, increase pedestrian
accessibility and improve amenities [among others],” he added.
The MRT
line will significantly improve rail-based public transport in the Klang Valley,
and create more than 130,000 jobs in its construction.
The MRT project,
one of the largest under the 10th Malaysian Plan, is scheduled for completion by
2017. It will cover 51km and will have 31 stations and three provisional
stations for future development.
Sufri, who is MBAM vice-president and
IFAWPCA chief delegate said: “Superior and well maintained infrastructure [will]
attract the best talent as well as dynamic businesses seeking reliable
connectivity and a high [standard] of living for its employees.”
He also
urged the government to quickly consider implementing other planned mega
infrastructure projects such as the High Speed Rail line to Singapore, and the
second and third lines of the MRT to ensure optimum and efficient use of
resources.
Sufri advised delegates to disseminate the knowledge gained
from the convention to improve service delivery in the construction value
chain.
IFAWPCA promotes international fellowship and cooperation, better
relationships between governments and contractors in the region, and improved
working arrangements in the construction industry.
Among the delegates
that attended the convention were senior general manager of the Construction
Industry Development Board Malaysia, Megat Kamil Azmi Megat Rus Kamarani, MBAM
honorary life president, Tan Sri Dr Yeoh Tiong Lay, president of Persatuan
Kontraktor Melayu Malaysia, Datuk Haji Mokhtar Samad and president of Sabah
Builders Association Choo Kim Min.
This article first appeared in
The Edge Financial Daily, on March 07, 2014.
For more information on
Building and Construction seminars, please visit www.asiapacificevents.com
Sunday, 27 April 2014
Thursday, 24 April 2014
UK apartments to be launched in Kuala Lumpur
KUALA LUMPUR: UK developer English Rose Estate Ltd will be selling its latest
premium residential product called Rupert Street to the Malaysian market over
this weekend in Kuala Lumpur.
“Rupert Street will appeal to [Malaysian] investors looking for prime, central London Zone 1 locations with the highest specifications and designs,” said Ockert Van Den Berg, the chief executive officer of English Rose Estate.
Rupert Street is in Soho, one of London’s most sought-after locations, and comprises two leasehold buildings offering 11 studio flats, 19 one-bedroom flats and four two-bedroom flats with built-ups of between 118 sq ft and 649 sq ft. Selected apartments offered to the Malaysian public start from £527,100 (RM2.8 million).
All apartments will have fully fitted kitchens with integrated appliances. They will be near public amenities such as world-class restaurants, shopping facilities and lifestyle centres.
They are also near Trafalgar Square, Piccadilly Circus and Leicester Square’s underground station, as well as the University of Central London, the London School of Economics and King’s College. The apartments offer Malaysians a rare opportunity to invest in London property, especially one in Soho, a central location within the city.
Rupert Street is expected to be completed in the first quarter of 2015.
English Rose Estate was established in 2001 and specialises in urban and brownfield regeneration for residential, commercial and mixed-use development and investment schemes. Its assets are in Mayfair, Marylebone and Fitzrovia.
“Rupert Street will appeal to [Malaysian] investors looking for prime, central London Zone 1 locations with the highest specifications and designs,” said Ockert Van Den Berg, the chief executive officer of English Rose Estate.
Rupert Street is in Soho, one of London’s most sought-after locations, and comprises two leasehold buildings offering 11 studio flats, 19 one-bedroom flats and four two-bedroom flats with built-ups of between 118 sq ft and 649 sq ft. Selected apartments offered to the Malaysian public start from £527,100 (RM2.8 million).
All apartments will have fully fitted kitchens with integrated appliances. They will be near public amenities such as world-class restaurants, shopping facilities and lifestyle centres.
They are also near Trafalgar Square, Piccadilly Circus and Leicester Square’s underground station, as well as the University of Central London, the London School of Economics and King’s College. The apartments offer Malaysians a rare opportunity to invest in London property, especially one in Soho, a central location within the city.
Rupert Street is expected to be completed in the first quarter of 2015.
English Rose Estate was established in 2001 and specialises in urban and brownfield regeneration for residential, commercial and mixed-use development and investment schemes. Its assets are in Mayfair, Marylebone and Fitzrovia.
For more information on Building and Construction seminars, please visit www.asiapacificevents.com
Wednesday, 23 April 2014
Seaview sets its sights on Iskandar Malaysia, Rapid
|
JOHOR BARU: Fresh from acquiring 51% of Damansara Realty Bhd, Johor-based
Seaview Holdings Sdn Bhd has set its sights on the opportunities present in
Iskandar Malaysia and Pengerang. Its chairman Datuk Daing Abdul Malek Daing Abdul Rahaman said, Seaview was vying to be actively involved in the fast-developing southern economic corridor and the Refinery and Petrochemical Integrated Development (Rapid) in Pengerang. National oil company, Petroliam Nasional Bhd (Petronas) has committed RM60 billion to develop Rapid. “Seaview plans to rejuvenate Damansara Realty’s property and construction divisions,” he said in a statement issued after the share sale agreement (SSA) between Seaview and Johor Corp (JCorp) here, yesterday. JCorp was the owner of Damansara Realty before selling its stake to Seaview for RM79 million. According to Daing Malek, the immediate plan is to further develop the businesses of Damansara, namely the parking business (Metro Parking (M) Sdn Bhd), facilities management (TMR Urusharta (M) Sdn Bhd), hospital consultancy (Healthcare Technical Services Sdn Bhd), and industrial cleaning. “I strongly believe Damansara Realty has untapped potential for growth and value increment for its shareholders,” he said. The acquisitions of Damansara Realty shares will trigger a mandatory general offer (MGO), where both parties expect the conditions set out in the SSA to be satisfied within a month, said Damansara Realty in the statement. “It is the intention of Seaview to maintain listing Damansara Realty upon completion of the MGO and to enhance the value proposition of its investment,” it said. — Bernama This article first appeared in The Edge Financial Daily, on March 07, 2014.
For more information on
Building and Construction seminars, please visit www.asiapacificevents.com
|
Tuesday, 22 April 2014
LBS Bina sticks to affordable, middle-range homes
KUALA LUMPUR: Property developer LBS Bina Group Bhd will continue to focus on
the affordable and middle-range residential market this year and in 2015, said
managing director Datuk Seri Lim Hock San.
“There is a growing demand from home-occupied buyers and LBS Bina will continue to support the government’s efforts to provide more options for the middle income bracket,” he said in a statement yesterday.
Lim said although the group has expanded into the high-end property sector with its flagship D’Island Residence in Puchong, Selangor, it continues to build affordable homes in the country.
LBS Bina was named “Best Company for Leadership of Property Development” at the 2014 International Alternative Investment Review (IAIR) Awards in Hong Kong recently.
“We take pride in receiving the acclaimed 2014 Best Company for Leadership in the Property Development category for Malaysia. Our aim is to be an internationally recognised developer and we regard this award as a testament from the market that we are on the right track,” said Lim.
He attributed the group’s success to its value proposition in “building inspiring lifestyle spaces that enhance community living”.
“We are not merely building homes, we are building communities,” said Lim.
The IAIR Awards recognise Asian companies based on eight judging criteria. They are sustainability, business results, leaderships in the field, strategic development, high quality of service, innovation in the field, education and green initiatives.
Award recipients were selected by over 50,000 IAIR readers, international teams of journalists and industry leaders through independent nomination questionnaires.
This article first appeared in The Edge Financial Daily, on March 07, 2014.
For more information on Building and Construction seminars, please visit www.asiapacificevents.com
“There is a growing demand from home-occupied buyers and LBS Bina will continue to support the government’s efforts to provide more options for the middle income bracket,” he said in a statement yesterday.
Lim said although the group has expanded into the high-end property sector with its flagship D’Island Residence in Puchong, Selangor, it continues to build affordable homes in the country.
LBS Bina was named “Best Company for Leadership of Property Development” at the 2014 International Alternative Investment Review (IAIR) Awards in Hong Kong recently.
“We take pride in receiving the acclaimed 2014 Best Company for Leadership in the Property Development category for Malaysia. Our aim is to be an internationally recognised developer and we regard this award as a testament from the market that we are on the right track,” said Lim.
He attributed the group’s success to its value proposition in “building inspiring lifestyle spaces that enhance community living”.
“We are not merely building homes, we are building communities,” said Lim.
The IAIR Awards recognise Asian companies based on eight judging criteria. They are sustainability, business results, leaderships in the field, strategic development, high quality of service, innovation in the field, education and green initiatives.
Award recipients were selected by over 50,000 IAIR readers, international teams of journalists and industry leaders through independent nomination questionnaires.
This article first appeared in The Edge Financial Daily, on March 07, 2014.
For more information on Building and Construction seminars, please visit www.asiapacificevents.com
Monday, 21 April 2014
City & Country: Big market for building of resorts in Malaysia
MALAYSIA has always been marketed as a travel destination famous for its
islands and beaches. Even the government’s Visit Malaysia Year 2014 campaign is
promoting them as one of the attractions.
According to Philippe Villeroux, the founder and director of Tropical Area Resort Consultants (TARC), Malaysia is not building resorts fast enough, considering it has a lot more to offer. TARC is a resort design consultancy.
“There are very few resort projects in Malaysia now,” says the Frenchman. “The resort industry is quite slow here.”
He says there are probably many reasons why the resort industry in the east coast is not thriving as much as it should.
“It’s probably due to the monsoon season.” However, he says it isn’t really a major issue.
“I think it’s a mistake because at the end of the day, you still have a nice place to visit and beautiful things to see.
“People generally say it’s going to be seasonal. Look at Koh Samui in Thailand, it has the same climate and season, and people still go there all year round. It’s a shame though, because Redang and Perhentian islands are so much better than Koh Samui.”
The problem, he says, is that Langkawi and other islands in Malaysia rely too much on transfer by boat.
“When you build a resort, you must provide the services as well. That means, if the sea is rough, there must be a way for visitors to reach the islands by other means.”
Building a reputation
Villeroux has 13 years of experience designing resorts in places like Sepang in Malaysia, the Maldives and French Polynesia, and used to work and live in Tahiti.
He was at the REKA Conference in October last year where he shared his knowledge and experience on resort designs in more than 40 remote locations.
He has done design work with Club Med when working at Eric Raffy & Associates. Then, he joined Tropical Architecture, a leading architecture firm in French Polynesia, where he gained extensive knowledge about overwater resorts.
When Tropical Architecture was hit by the global financial crisis in 1998, Villeroux was forced to move back to Tahiti. In 2001, he came back to Malaysia and set up Tropical Area Sdn Bhd, concentrating on resorts in the Maldives, French Polynesia and Southeast Asia.
“I came to Malaysia in the early 1990s to work on a Club Med Cherating renovation project. I was working in French Polynesia at the time. Tahiti is a beautiful place, but it was too far for doing business.”
Villeroux says he fell in love with Malaysia during his journey to Cherating, Pahang, from Kuala Lumpur.
“At the time, there was no highway and the trip just made me fall in love with the rainforest between Pahang and Kuala Lumpur. It’s difficult to explain.”
He has worked on a host of projects in Malaysia, including Sepang Gold Coast in Sepang, Selangor, and Club Med Cherating, Pahang, as well as a few others in Langkawi, Ipoh and Kuala Lumpur.
According to him, his company has 75 projects in Malaysia, both completed and ongoing.
“It’s starting to be a good business for us because we have built a reputation. And it’s purely by word of mouth.”
Villeroux says a resort is the location and the environment, not the buildings.
People don’t come for the buildings. You go to a resort because of the location, the beaches, the forests and the views.
“Something I learnt while working with Six Senses Hotels Resorts Spas in the Maldives is that the ideal resort is one without buildings. If you have a beautiful island, you only need a building, just a nice place to sleep.”
Today, almost half of TARC’s clients come to them with a parcel of land earmarked for a resort. “We have clients who have land but don’t know what to do with it,” he says.
Despite the good demand for his services, Villeroux never takes on more than four projects at a time.
“My strategy is to stay small. It’s pretty easy to grow the company, but all I want is to maintain a small team of not more than 20 people. We are focusing on quality rather than quantity.”
According to him, TARC wants to improve its products and services. “It’s smaller, so the quality is better. The turnover will grow with the quality of our projects.”
This strategy is also a safety measure in terms of being able to withstand the ups and downs of the market since there are a lot of challenges in this industry, he says.
“We had a project in Lahad Datu that was affected by the intrusion of Sulu gunmen, while a kidnap and murder case happened at another project on Pom Pom island in Sabah. This means that the projects are often halted. We have to be conservative.”
He says most of his projects take eight to 10 years to complete, particularly if there are issues with land rights and design.
Moving ahead
He adds that 2014 is going to be a year of continuity for several of his projects.
“We are in the process of designing two projects in Sabah. We’re also starting the physical work at Ritz Carlton in Langkawi and a project each in the Maldives and Bali.”
In Sabah, Villeroux is looking at smaller projects. Besides the two in hand, Villeroux is expecting to take on another six to seven equally smaller projects. “One of our projects is on Pulau Gaya. The first phase will be a sort of kelong floating around the island, never staying at one spot for more than six months. It’s for people who don’t like making reservations. So we are trying to work with the villagers on the island to sell their produce to the tourists.”
He adds that the kelong project will take a long time to complete as it will have to go through several phases, from design to construction.
However, he says, the state authorities are very helpful. “It’s a matter of explaining and making them understand. Most of the time it’s just respecting the locals and taking into account their needs. This is the balance you have to strike.”
On the challenges he faces in the industry, Villeroux says the time it takes to complete a project is one of them.
“Our projects are usually developed over five to 10 years. During this period, there will be bursts of intense work and long waits. It is quite difficult to have the same focus on the project while having to organise our activities with flexibility.”
TARC also experiences some financial difficulties. According to him, the contract fees may seem promising initially, but will look very small after six years of work, with another two years to go.
“So, you really need to focus on the project and its achievement instead of the financial gain.”
Another challenge is the members of his team. Villeroux says it is difficult to find professionals with long-term commitment and the ability to adapt to different environments.
“Our projects usually seem simple to young architects. However, designing small buildings in natural settings is not as appealing to them as designing a 100-storey tower. In fact, this requires a lot of knowledge, culture and sensitivity.”
Villeroux’s solution to this is to have a small team of key people. Some of his staff have been with him since the establishment of the company.
However, his greatest challenge is aborted projects. “As we usually intervene at the early stages of development, clients sometimes don’t know what they want to do with their investment, so many projects are never completed.”
He says for every project completed, five are stopped at different stages of design. He adds that one client said he would rather spend RM10 million in abortive studies than lose RM50 million in a failed resort.
“It is very difficult to have dreamed of a resort that you always believe will be the best only to realise that it will never happen.
“The ideas we come up with for a particular project are never applied to another. We design based on the site and the type of holiday the resort will provide, so a lot of the solutions are unique. It hurts to see that some of them will never be used.”
This article first appeared in The Edge Malaysia Weekly, on February 14, 2014.
For more information on Building and Construction seminars, please visit www.asiapacificevents.com
According to Philippe Villeroux, the founder and director of Tropical Area Resort Consultants (TARC), Malaysia is not building resorts fast enough, considering it has a lot more to offer. TARC is a resort design consultancy.
“There are very few resort projects in Malaysia now,” says the Frenchman. “The resort industry is quite slow here.”
He says there are probably many reasons why the resort industry in the east coast is not thriving as much as it should.
“It’s probably due to the monsoon season.” However, he says it isn’t really a major issue.
“I think it’s a mistake because at the end of the day, you still have a nice place to visit and beautiful things to see.
“People generally say it’s going to be seasonal. Look at Koh Samui in Thailand, it has the same climate and season, and people still go there all year round. It’s a shame though, because Redang and Perhentian islands are so much better than Koh Samui.”
The problem, he says, is that Langkawi and other islands in Malaysia rely too much on transfer by boat.
“When you build a resort, you must provide the services as well. That means, if the sea is rough, there must be a way for visitors to reach the islands by other means.”
Building a reputation
Villeroux has 13 years of experience designing resorts in places like Sepang in Malaysia, the Maldives and French Polynesia, and used to work and live in Tahiti.
He was at the REKA Conference in October last year where he shared his knowledge and experience on resort designs in more than 40 remote locations.
He has done design work with Club Med when working at Eric Raffy & Associates. Then, he joined Tropical Architecture, a leading architecture firm in French Polynesia, where he gained extensive knowledge about overwater resorts.
When Tropical Architecture was hit by the global financial crisis in 1998, Villeroux was forced to move back to Tahiti. In 2001, he came back to Malaysia and set up Tropical Area Sdn Bhd, concentrating on resorts in the Maldives, French Polynesia and Southeast Asia.
“I came to Malaysia in the early 1990s to work on a Club Med Cherating renovation project. I was working in French Polynesia at the time. Tahiti is a beautiful place, but it was too far for doing business.”
Villeroux says he fell in love with Malaysia during his journey to Cherating, Pahang, from Kuala Lumpur.
“At the time, there was no highway and the trip just made me fall in love with the rainforest between Pahang and Kuala Lumpur. It’s difficult to explain.”
He has worked on a host of projects in Malaysia, including Sepang Gold Coast in Sepang, Selangor, and Club Med Cherating, Pahang, as well as a few others in Langkawi, Ipoh and Kuala Lumpur.
According to him, his company has 75 projects in Malaysia, both completed and ongoing.
“It’s starting to be a good business for us because we have built a reputation. And it’s purely by word of mouth.”
Villeroux says a resort is the location and the environment, not the buildings.
People don’t come for the buildings. You go to a resort because of the location, the beaches, the forests and the views.
“Something I learnt while working with Six Senses Hotels Resorts Spas in the Maldives is that the ideal resort is one without buildings. If you have a beautiful island, you only need a building, just a nice place to sleep.”
Today, almost half of TARC’s clients come to them with a parcel of land earmarked for a resort. “We have clients who have land but don’t know what to do with it,” he says.
Despite the good demand for his services, Villeroux never takes on more than four projects at a time.
“My strategy is to stay small. It’s pretty easy to grow the company, but all I want is to maintain a small team of not more than 20 people. We are focusing on quality rather than quantity.”
According to him, TARC wants to improve its products and services. “It’s smaller, so the quality is better. The turnover will grow with the quality of our projects.”
This strategy is also a safety measure in terms of being able to withstand the ups and downs of the market since there are a lot of challenges in this industry, he says.
“We had a project in Lahad Datu that was affected by the intrusion of Sulu gunmen, while a kidnap and murder case happened at another project on Pom Pom island in Sabah. This means that the projects are often halted. We have to be conservative.”
He says most of his projects take eight to 10 years to complete, particularly if there are issues with land rights and design.
Moving ahead
He adds that 2014 is going to be a year of continuity for several of his projects.
“We are in the process of designing two projects in Sabah. We’re also starting the physical work at Ritz Carlton in Langkawi and a project each in the Maldives and Bali.”
In Sabah, Villeroux is looking at smaller projects. Besides the two in hand, Villeroux is expecting to take on another six to seven equally smaller projects. “One of our projects is on Pulau Gaya. The first phase will be a sort of kelong floating around the island, never staying at one spot for more than six months. It’s for people who don’t like making reservations. So we are trying to work with the villagers on the island to sell their produce to the tourists.”
He adds that the kelong project will take a long time to complete as it will have to go through several phases, from design to construction.
However, he says, the state authorities are very helpful. “It’s a matter of explaining and making them understand. Most of the time it’s just respecting the locals and taking into account their needs. This is the balance you have to strike.”
On the challenges he faces in the industry, Villeroux says the time it takes to complete a project is one of them.
“Our projects are usually developed over five to 10 years. During this period, there will be bursts of intense work and long waits. It is quite difficult to have the same focus on the project while having to organise our activities with flexibility.”
TARC also experiences some financial difficulties. According to him, the contract fees may seem promising initially, but will look very small after six years of work, with another two years to go.
“So, you really need to focus on the project and its achievement instead of the financial gain.”
Another challenge is the members of his team. Villeroux says it is difficult to find professionals with long-term commitment and the ability to adapt to different environments.
“Our projects usually seem simple to young architects. However, designing small buildings in natural settings is not as appealing to them as designing a 100-storey tower. In fact, this requires a lot of knowledge, culture and sensitivity.”
Villeroux’s solution to this is to have a small team of key people. Some of his staff have been with him since the establishment of the company.
However, his greatest challenge is aborted projects. “As we usually intervene at the early stages of development, clients sometimes don’t know what they want to do with their investment, so many projects are never completed.”
He says for every project completed, five are stopped at different stages of design. He adds that one client said he would rather spend RM10 million in abortive studies than lose RM50 million in a failed resort.
“It is very difficult to have dreamed of a resort that you always believe will be the best only to realise that it will never happen.
“The ideas we come up with for a particular project are never applied to another. We design based on the site and the type of holiday the resort will provide, so a lot of the solutions are unique. It hurts to see that some of them will never be used.”
This article first appeared in The Edge Malaysia Weekly, on February 14, 2014.
For more information on Building and Construction seminars, please visit www.asiapacificevents.com
Sunday, 20 April 2014
Developer marks historic opening
![]() |
Significant moment: Teh (centre) presenting the mock
cheque for their sponsorship to Lim (right) and looking on is Tew.
|
MAH Sing Group Bhd will be sponsoring RM10,000 worth of The Star in
conjunction with the official launch of the second Penang bridge this
weekend.
Its chief operating officer Teh Heng Chong said he was proud of their
partnership with “The People’s Paper” and the two companies had worked together
on many other projects in the past.
“It was an easy decision to work again with The Star for this historic moment
in Penang’s history.
“The second Penang bridge will not only ease traffic congestion but also
bring new opportunities to Batu Kawan on the mainland and Batu Maung on the
island,” said Teh, adding that the airport is also located nearby.
Teh was speaking after presenting a mock cheque for RM10,000 to The Star’s
circulation assistant manager Andrew Lim at Wisma Mah Sing, Jalan Sungai Besi
yesterday. Also present was Mah Sing’s corporate communications general manager
Lyanna Tew.
Mah Sing is developing Loft@Southbay City in Batu Maung, comprising
low-density serviced residences, just a stone’s throw from the second
bridge.
“The bridge will increase exposure for our projects in Penang.
“Our developments at Southbay City include South City Plaza, terrace houses,
commercial centres and bungalow units that are expected to be completed by the
end of this year,” said Teh.
Prime Minister Datuk Seri Najib Tun Razak will launch the bridge, the longest
in South-East Asia at 24km, at 8pm today.
Mah Sing Group Bhd will set up several booths to showcase their projects at
the landing of the bridge in Batu Maung from 11am to midnight today and
tomorrow.
For more information on Building and Construction seminars, please visit www.asiapacificevents.com
Thursday, 17 April 2014
Luxury development rapidly taking shape in Kuala Lumpur
![]() | ||
The interior for one of the show units for The Horizon.
– Photos by AZLINA ABDULLAH
A new luxury residential tower will soon grace Jalan Tun Razak in Kuala
Lumpur.
The Horizon Residences, developed by Hap Seng Land Sdn Bhd, will feature
serviced apartments in two 27-storey towers that sit on 1.35 acres of freehold
land.
With a prices from RM1,300 psf, the development offers units with built-up
areas ranging between 549sq ft to 2,551sq ft for its typical units, and 3,552sq
ft to 4,316sq ft for the penthouses.
Once completed, the 335 units that are semi-furnished, will have easy access
to embassies nearby, the Prince Court Medical Centre, an international school,
and malls .
According to a news report, Japanese department store operator Takashimaya Co
Ltd is said to beconsidering setting up an outlet at the Tun Razak Exchange
(TRX), Kuala Lumpur’s upcoming international financial district, which is a
stone’s throw from The Horizon Residences development.
Some of the main features of the project include panoramic views of either
the Royal Selangor Golf Club, the Kuala Lumpur city skyline or Petronas Twin
Towers.
David Khor, Hap Seng Land’s chief operating officer, says, currently the
apartments have been attracting the interest of both local and foreign
buyers.
“The profile of local buyers are aged 40 and up, while smaller units are
mostly taken up by young professionals in their 30s.
“We have had Singaporeans, South Koreans and Japanese buying our units,” Khor
said, adding that foreign buyers so far are from nine nationalities.
He said approximately 90% of the units have already been sold.
The project, which has a gross development value of RM412mil, features a
floating gym, a 50m infinity edge lap pool, a bubble jet pond with stepping
stones and a comprehensive three-tier security system.
Each unit is also equipped with double-glazed glass to cut out external noise
from traffic.
“This is one of the luxury developmentsbeing worked on by the company. It’s
not just a good location but it’s also filled with energy-saving fittings.””
said Khor.
According to Khor, the project is using the Construction Quality Assessment
System for , a widely recognised and internationally accepted construction
quality assessment system by Singapore’s Building and Construction Authority to
measure quality standards in building projects.
The project has also submitted a Green Building Index certification, which is
a green rating tool for buildings.
Officially launched in January last year, the project is expected to be
completed by March 2015.
For more information on Building and Construction seminars, please visit www.asiapacificevents.com
|
Subscribe to:
Posts (Atom)


